
Structured Cabling and Fiber Backbone
Cat6 and fiber runs, patch panels, racks and in-building backbone fiber for offices and multi-tenant buildings.
- Permits and inspections handled
- Test results and documentation
- Project management

Is structured cabling right for your business?
Clean runs, labelled panels, every run tested.
A new office or a build-out
Permits and inspections for cabling work are handled inside the project. Most offices take a few days.
A building that needs a fiber backbone between floors
We install fiber backbones between floors and buildings, terminated and tested, as the spine of a building network that the building owns.
A closet nobody wants to open
We re-terminate, label and document existing closets and patch panels, replace failed runs, and leave a closet an engineer can work in without guessing.
What you get
Design
Cat6 and fiber
Patch panels and racks
Backbone fiber
Certified test results
Project management
How it starts
- 1
Contact us
Call us or fill out a short form.
- 2
Site walk
We scope the whole project, from design to test results.
- 3
Quote with a schedule
We quote the whole project, and the schedule is agreed before work starts.
- Day 1: first contact
- Before work starts: the schedule is agreed
- Most offices: a few days
FAQ
Do you certify cable runs?
Yes. Every run is tested and the certified test results are delivered with the project documentation, so you have proof the cabling meets the standard before the network goes live.
Do you run fiber between floors?
Yes. We install fiber backbones between floors and buildings, terminated and tested, as the spine of a building network that the building owns.
Do you handle cabling permits?
Yes. Permits and inspections for cabling work are handled inside the project, so you sign one agreement and we coordinate with the building and the county.
Can you tidy an existing network closet?
Yes. We re-terminate, label and document existing closets and patch panels, replace failed runs, and leave a closet an engineer can work in without guessing.
How long does cabling an office take?
Most offices take a few days. Whole buildings are scheduled floor by floor around tenants, and the schedule is agreed with the property manager before work starts.
Tell us what is broken or what you are planning. We will tell you what it costs.
- A member of our team calls you back between 8:00 AM and 8:00 PM ET.
- We tell you which service fits and what it costs, in writing.
- You decide. No contract to talk, and no obligation.